Working on Western Australia's flagship projects.

Mandurah Bridge Duplication

Client: Georgiou
Sector: Bridges / Main Roads
In alliance with Main Roads WA, the ‘Georgiou Estuary Bridge Duplication’, located 70km south of Perth, expects to improve connectivity, reduce travel times for over 33,000 daily users, and heighten safety measures for the public. Beginning in February 2024, the duplication features a new, two-lane bridge alongside the original bridge, as well as 4m wide footpath covering the expansion. WGLS have successfully tested over 1360 samples to date for material conformance testing, including NDM, PSP & DCP methods.